Main Factors Causing Delays in Large Construction Projects: Evidence from New Zealand
Abdullah, M. R., Rahman, I. A., & Azis, A. A. A. (2010). Causes of delay in MARA management procurement construction projects. Journal of Surveying, Construction and Property, 8(1), 123-138.
Afshari, A., Khosravi, S., Ghorbanali, A., Borzabadi, M., & Valipour, M. (2011). Identification of causes of non-excusable delays of construction projects. Proceedings of the International Conference on E-business, Management and Economics.
Afshari, H., Khosravi, S., Ghorbanali, A., Borzabadi, M., & Valipour, M. (2010, December). Identification of causes of non-excusable delays of construction projects. Proceedigs of the International conference on e-business, management and economics (pp. 42-46). IPEDR, IACSIT Press, Hong Kong.
Ahmed, S. M., Azhar, S., Castillo, M., & Kappagantula, P. (2002). Construction delays in Florida: An empirical study. Final report. Department of Community Affairs, Florida, US. http://www.cm.fiu.edu/pdfs/Research_Reports/Delays_Project.pdf.
Ahmed, S. M., Azhar, S., Kappagntula, P., & Gollapudil, D. (2003, April). Delays in construction: a brief study of the Florida construction industry. In Proceedings of the 39th Annual ASC Conference (pp. 257-266), Clemson University, Clemson, SC.
Aibinu, A. A., & Odeyinka, H. A. (2006). Construction delays and their causative factors in Nigeria. Journal of construction engineering and management, 132(7), 667-677. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(667)
Alaghbari, W., Kadir, M. R. A., Salim, A. & Ernawati, A. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192-206. https://doi.org/10.1108/09699981111111166
Al-Khalil, M. I., & Al-Ghafly, M. A. (1999). Important causes of delay in public utility projects in Saudi Arabia. Construction Management and Economics, 5, 647-655. https://doi.org/10.1080/014461999371259
Anvuur, A., Kumaraswamy, M., & Mahesh, G. (2006). Which governs – the relationship or the contract? Proceedings of the Annual Research Conference of the Royal Institution of Chartered Surveyors, September 2006, University College London, United Kingdom (pp. 99-106). RICS Foundation/ The Bartlett School, University College London: London, UK.
Assaf, S. A., & Al-Heijj, S. (2006). Causes of delay in large projects. International Journal of Project Management, 24(4) 349-357. https://doi.org/10.1016/j.ijproman.2005.11.010
Davis, N. (2007). Construction sector productivity. New Zealand: Martin Jenkins.
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2011). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30, 479-489. https://doi.org/10.1016/j.ijproman.2011.10.004
Durdyev, S., & Ismail, S. (2012). Pareto analysis of on-site productivity constraints and improvement techniques in construction industry, Scientific Research and Essays, 7(7), 824-833. https://doi.org/10.5897/SRE12.005
Durdyev, S., & Ismail, S. (2016). On-site construction productivity in Malaysian infrastructure projects, Structural Survey, 34(4/5), 446-462. https://doi.org/10.1108/SS-12-2015-0058
Durdyev, S., & Mbachu, J. (2011). On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures, Australasian Journal of Construction Economics and Building, 11(3), 18-33. https://doi.org/10.5130/AJCEB.v11i3.2120
Durdyev, S., & Mbachu, J. (2017). Key Constraints to Labour Productivity in Residential Building Projects: Evidence from Cambodia, International Journal of Construction Management. (Forthcoming) https://doi.org/10.1080/15623599.2017.1326301
Durdyev, S., Omarov, M., & Ismail, S. (2017). Causes of delay in residential construction projects in Cambodia, Cogent Engineering, 4(1): 1-8. https://doi.org/10.1080/23311916.2017.1291117
Faridi, A. S., & El-Sayegh, S. M. (2006). Significant factors causing delay in the UAE. Construction Management and Economics, 24(11), 1167-1176. https://doi.org/10.1080/01446190600827033
Flyvbjerg, B. (2005). Policy and planning for large infrastructure projects: Problems, causes, cures. World Bank Research Working Paper, No. 3781, 1-32.
Frimpong, Y. A. W. & Oluwoye, J. (2003). Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana. Journal of Construction Research, 4(2), 175-187. https://doi.org/10.1142/S1609945103000418
Frodel, M., & Josephson, P. E. (2009). Perceived Constraints when Establishing and Maintaining Contractor Supplier Relations in Construction. Construction Management, Chalmers University of Technology.
Kumaraswamy, M. M., & Chan, D. W. M. (1998). Contributors to construction delays. Construction Management and Economics, 16(1998), 17-29. https://doi.org/10.1080/014461998372556
Marzouk, M. M., & El-Rasas, T. I. (2012). Analyzing delay causes in Egyptian construction projects. Journal of Advanced Research. http://dx.doi.org/10.1016/j.jare.2012.11.005
Mohammed, A. M., & Isah, A. D. (2012). Causes of delay in Nigeria construction industry. Journal of Contemporary Research Business, 4(2), 785-794.
Motaleb, O., & Kishk, M. (2010). An investigation into causes and effects of construction delays in UAE. Proceedings of the 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, U.K.( pp. 1149-1157). Association of Researchers in Construction Management.
Mouton, J. (2001). How to succeed in your master’s and doctoral studies: A South African guide and resource book. Pretoria: Van Schaik Publishers.
Naoum, S. G. (1998). Dissertation research and writing for construction students. Oxford: Butterworth-Heinemann.
Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delay: traditional contracts. International Journal of Project Management, 20(1), 67-73. https://doi.org/10.1016/SO263-7863(00)00037-5
Ogunlana, S. O, Promkuntong, K., & Vithool, J. (1996). Construction delays in a fast growing economy: Comparing Thailand with other economies. International Journal Project Management, 14(1), 37-45. https://doi.org/10.1016/0263-7863(95)00052-6
Ren, Z., Atout, M., & Jones, J. (2008). Root causes of construction project delays in Dubai. Dainty Procs 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK (pp/ 749-757). Association of Researchers in Construction Management.
Sambasivan, M., & Soon, Y. W. ( 2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 5(5), 517-526. https://doi.org/org.libproxy.unitec.ac.nz/10.1016/j.ijroman.2006.11.007
Scott, S. (1993). The nature and effects of construction delays. Construction Management and Economics, 11(5), 358-369. https://doi.org/10.1080/01446199300000040
Sweis, G., Sweis, R., Hammad, A., & Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management, 26(6), 665-674. https://doi.org/10.1016/j.ijproman.2007.09.009.
Toor, S., & Ogunlana, S. O. (2007). Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), 395-408. https://doi.org/10.1080/01446190801905406
Vrijhoef, R., & de Ridder, H. (2007). A systems approach for developing a model of construction supply chain integration. Proceedings 4th Nordic Conference on Construction Economics and Organisation, 14-15 June, 2007, Lulea, Sweden (pp. 3-14).